Working-set figure: linear node axes + benefit/cost split
Drop log node axis (decade ticks were unreadable). Left = APC vs #nodes (linear), right = #nodes vs retention window T. Mark the 1-node budget crossing (~7s reuse, ~8% APC) and the 14-node oracle ceiling. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
Binary file not shown.
|
Before Width: | Height: | Size: 150 KiB After Width: | Height: | Size: 165 KiB |
Reference in New Issue
Block a user