Working-set figure: linear node axes + benefit/cost split

Drop log node axis (decade ticks were unreadable). Left = APC vs #nodes
(linear), right = #nodes vs retention window T. Mark the 1-node budget
crossing (~7s reuse, ~8% APC) and the 14-node oracle ceiling.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
2026-05-28 16:24:15 +08:00
parent 3b8be5bb61
commit c94b2e237a
2 changed files with 60 additions and 36 deletions

Binary file not shown.

Before

Width:  |  Height:  |  Size: 150 KiB

After

Width:  |  Height:  |  Size: 165 KiB