Report failed fidelity pilot gate
This commit is contained in:
@@ -1,10 +1,16 @@
|
||||
# Fidelity-aware harness headroom audit
|
||||
|
||||
Status: **PROMISING PREMISE, NO CONTRIBUTION CLAIM**.
|
||||
Status: **HISTORICAL PREMISE DID NOT PASS PROSPECTIVE P1; NO CONTRIBUTION CLAIM**.
|
||||
|
||||
The audit answers whether engine instrumentation has enough incremental signal
|
||||
to justify a prospective experiment. It does not establish generalization.
|
||||
|
||||
Post-run update: the exact-timestamp held-out P1 completed and failed the
|
||||
registered gate. Under the stronger simulator-aware `k=2` end-to-end replay,
|
||||
telemetry preserved zero regret but saved only 1.426% online H20-hours versus
|
||||
sim top-k + real final. The current route is closed; see
|
||||
`docs/fidelity-aware-harness-p1-report-20260714.md`.
|
||||
|
||||
## Simulator shortlist lower bound
|
||||
|
||||
On the frozen 12-cell SimFid task, the strongest calibrated SLO simulator
|
||||
|
||||
Reference in New Issue
Block a user