Working-set figure: right panel = W(t) time series

Replace the (redundant) nodes-vs-T cost curve with the working-set
W(t) over wall-clock time for T=2/30/300s. Shows footprint is steady
(peak ~ median) after a short warm-up, so peak-based sizing is sound;
the 300s curve hugs the 14-node ceiling throughout.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
2026-05-28 16:31:26 +08:00
parent c94b2e237a
commit 2247d1de08
2 changed files with 30 additions and 24 deletions

Binary file not shown.

Before

Width:  |  Height:  |  Size: 165 KiB

After

Width:  |  Height:  |  Size: 190 KiB