2247d1de08cde07cd8d6eb21aca0bed6d5ceaeec
Replace the (redundant) nodes-vs-T cost curve with the working-set W(t) over wall-clock time for T=2/30/300s. Shows footprint is steady (peak ~ median) after a short warm-up, so peak-based sizing is sound; the 300s curve hugs the 14-node ceiling throughout. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
Description
No description provided
Languages
Python
82.9%
Shell
17.1%