Gahow Wang 18f1bd4240 Update MEETING.md + PAPER_OUTLINE.md with connector_tax substrate validation
2026-05-27 trace-replay A/B/C (commit ef9e010) shows the kv_both substrate
is net positive on current codebase, not just neutral:
  - TTFT p90: 11.97s plain → 9.74s kv_both (−18.6%) → 7.58s with DR-fix (−36.6%)

This reverses the elastic_migration_v2 paper's +45% kv_both penalty claim
and removes the primary cause of the 4 prior migration reverts.

Reframes EAR Pillar 2 from "DEFERRED" to "PARTIAL" — substrate verified,
e2e strategy-layer validation (trigger thresholds + target selection in
the dispatch-coupling feedback loop) remains as the only open risk.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-27 09:17:31 +08:00
Description
No description provided
48 MiB
Languages
Python 82.9%
Shell 17.1%